How to use raw materials to process wire mesh better

Raw material of wire mesh sheet cold drawn low carbon steel wire base material can choose low carbon steel hot rolled disk bar or hot rolled smooth steel bar. The base material number and diameter of cold-drawn low carbon steel wire can be confirmed according to the rules in the table below. During the cold drawing process, the surface shrinkage rate of each drawing should not be greater than the wire mesh before cold drawing. Annealing shall not be carried out during wire drawing. If butt welding is required, the same production unit and base material of the same number should be selected. The appearance quality of wire mesh should not affect wire drawing. When the welding function is poor or brittle fracture occurs, special inspection should be carried out according to relevant standards.

wire mesh

The appearance quality of cold-drawn low carbon steel wire in each inspection lot shall be all visually inspected. The appearance of steel wire shall not have cracks, burrs, corrosion and mechanical damage affecting mechanical function. Cold-drawn low carbon steel wire with unqualified appearance can be used in engineering after treatment and inspection.
The acceptance of cold-drawn low carbon steel wire shall be conducted according to the same production unit, the same raw material, the same diameter, and shall not exceed 30T for an inspection lot, and check the base material into the factory or out of the inspection statement. The inspection items for each inspection lot are appearance quality, diameter error, tensile test (including tensile strength and elongation) and repeated bending test.
No less than 5 disks should be extracted from each inspection lot for diameter error inspection. 1 point of steel wire should be extracted from each disk to measure steel wire diameter, and the actual diameter of steel wire at this point should be taken as the average value of the two vertical directions. The diameter error of cold-drawn low carbon steel wire should conform to the rules in the table below. The unqualified inspection batches shall be checked one by one, and the qualified batches can be used for engineering.


Post time: 18-11-21